Journal · Frequently asked questions

Is resin compatible with underfloor heating?

In many cases yes, provided the screed, heating system, joints and application build-up are assessed together. Heat does not remove the need for a stable, properly cured substrate.

01

The screed comes first

Residual moisture, curing, flatness and cracking must be checked. The heating commissioning cycle before installation can also be decisive.

02

Movement and joints

Temperature changes cause movement. Structural and movement joints should not be ignored or indiscriminately covered; they need to be understood within the project.

03

Use after installation

Restarting the system and increasing temperature should follow the guidance for the selected build-up and site. Gradual adjustment protects both surface and substrate.

This information supports orientation and does not replace assessment of the substrate and actual project conditions.

Every project begins with a conversation.

Tell us about the space, how it will be used and the atmosphere you want. The surface comes next: first we understand the project.

Tell us about your project WhatsApp Call